|
Below is our list of upcoming demolitions and implosions.
When you see a demolition that you would like to attend, we recommend that you use the internet to check for news sources. When possible, we
will include a link that will perform a Google news search (with the results in a new window).
Keep in mind that our information is largely second-hand and demolition plans can change right-up to the last minute.
The Cannon Mills Towel Distribution Center
Scheduled: August 18th, 2007 (Sat) at 7:00 AM
The morning of the implosion of the 7-story, 1,000,000 square foot building, the city will close
off a section of North Loop Road between North Main Street and Vance Street.
A viewing area is to be established at the Kannapolis Cemetery (next to Village Park)
and on the sidewalk along North Loop Road.
Demolition By: D.H. Griffin Wrecking Company & Dykon Explosive Demolition Corp.
The Key Bank Tower
Scheduled: August 18th, 2007 (Sat) at 6:30 AM
The 20-story Key Bank Tower is located in downtown Salt Lake City at 50 South Main Street.
A safety area will be established from State Street to 200 West and North Temple to 200 South.
No public viewing area has been defined.
Demolition By: Controlled Demolitions Inc. (CDI)
The Brach Candy Factory
Scheduled: Tentatively scheduled for August 29th, 2007 (Wed)
Rumor has it that a 4-story building at the former Brach Candy Factory
will be imploded for the new Batman movie ('The Dark Knight').
The Sands Casino
Scheduled: Fall 2007 (probably in October)
Demolition By: Controlled Demolitions Inc. (CDI)
|